Transport For London (LogicaCMG)

Role: Technical Architect

Dates: Apr 2006 to May 2006

This fixed price piece of work involved producing a feasibility study which combined the current user requirements with long term work studies that had already been undertaken. The results of this study will be taken to determine the size and scope of further related work.